PAZMINO BUILD ACADEMYTHIS IS NEW YORK. WE BUILD DIFFERENT.
L6 Renovation Crew

Level 6 – Interior Renovation Training

Nivel 6 – Entrenamiento de Renovación Interior

Complete every module, pass the written quiz, sign the acknowledgment, and download the completion record for your supervisor.

Completa cada módulo, aprueba el examen escrito, firma el reconocimiento y descarga el registro para tu supervisor.

Not Completed / No Completado   Last score / Última nota:

Employee Profile / Perfil del Empleado

Course Progress / Progreso del Curso

0% modules reviewed / módulos revisados
Module 1: Project Review & DocumentationMódulo 1: Revisión y Documentación
  • Review approved demolition, layouts, finishes, MEP locations, appliances, and building rules.
  • Photograph floors, walls, ceilings, windows, doors, fixtures, damage, and common areas before work.
  • Revisa demolición, layouts, acabados, MEP, appliances y reglas.
  • Fotografía pisos, paredes, techos, ventanas, puertas, fixtures, daños y áreas comunes antes.
Module 2: Property & Dust ProtectionMódulo 2: Protección y Polvo
  • Protection goes down before tools come out.
  • Use project-required containment, HEPA/dust controls, floor protection, sealed openings, and debris routes.
  • Primero protección, después herramientas.
  • Usa contención, HEPA/control de polvo, protección de piso, sellado y rutas de escombros según requiera.
Module 3: Lead-Safe RenovationMódulo 3: Renovación Segura con Plomo
  • Determine whether lead-related requirements apply before disturbing painted surfaces.
  • Follow the assigned Certified Renovator and lead-safe work practices where required; this course does not make someone a Certified Renovator.
  • Determina si aplican requisitos de plomo antes de alterar pintura.
  • Sigue al Certified Renovator asignado y prácticas lead-safe cuando aplique; este curso no certifica como Renovator.
Module 4: Selective DemolitionMódulo 4: Demolición Selectiva
  • Confirm what stays and what goes, control utilities, dust, debris, and access.
  • Remove only authorized work and stop for hidden conditions.
  • Confirma qué se queda y qué se remueve, controla utilidades, polvo, escombros y acceso.
  • Remueve solo lo autorizado y para ante condiciones ocultas.
Module 5: Framing & Structural AwarenessMódulo 5: Framing y Estructura
  • Verify layout, openings, blocking, plumb, and connections.
  • Do not modify structural walls, beams, columns, or joists without authorized direction.
  • Verifica layout, aberturas, blocking, plomo y conexiones.
  • No modifiques elementos estructurales sin instrucciones autorizadas.
Module 6: MEP & Wall ClosureMódulo 6: MEP y Cierre de Pared
  • Before closing walls/ceilings/floors, verify required electrical, plumbing, HVAC, blocking, insulation, inspections, and hidden-work photos.
  • Do not perform regulated trade work unless authorized/qualified.
  • Antes de cerrar, verifica electricidad, plomería, HVAC, blocking, insulación, inspecciones y fotos.
  • No realices trabajo regulado sin autorización/calificación.
Module 7: Drywall & WaterproofingMódulo 7: Drywall e Impermeabilización
  • Use correct board and finish requirements.
  • Inspect waterproofing, drains, corners, penetrations, and required testing before tile.
  • Usa board y acabado correctos.
  • Revisa impermeabilización, drenajes, esquinas, penetraciones y pruebas antes de tile.
Module 8: Tile & FlooringMódulo 8: Tile y Pisos
  • Confirm layout/pattern/substrate/transitions and protect finished work.
  • Do not install over obvious moisture, uneven, loose, or damaged substrate problems without direction.
  • Confirma layout/patrón/base/transiciones y protege acabados.
  • No instales sobre humedad, desnivel, base suelta o dañada sin instrucciones.
Module 9: Cabinets & CountertopsMódulo 9: Gabinetes y Countertops
  • Verify cabinet layout, dimensions, appliance openings, sink, damage, level/plumb, fastening, doors/drawers.
  • Do not force a cabinet to fit a bad measurement.
  • Verifica layout, medidas, appliances, fregadero, daños, nivel/plomo, fijación, puertas/gavetas.
  • No fuerces un gabinete para corregir mala medida.
Module 10: Windows, Doors & PaintMódulo 10: Ventanas, Puertas y Pintura
  • Verify sizes, openings, operation, sealing, hardware, and final finish.
  • Protect the opening during window replacement and protect finished surfaces during paint.
  • Verifica medidas, aberturas, funcionamiento, sellado, hardware y acabado.
  • Protege la abertura al cambiar ventana y protege superficies durante pintura.
Module 11: Kitchen/Bath Completion, Punch & CloseMódulo 11: Cocina/Baño, Punch y Cierre
  • Test applicable fixtures, lighting, doors/windows, drawers, drainage, and leaks.
  • Crew self-punches before PM/customer; final cleaning and final photos are required.
  • Prueba fixtures, luces, puertas/ventanas, gavetas, drenaje y filtraciones.
  • La cuadrilla hace auto-punch antes del PM/cliente; limpieza y fotos finales requeridas.

Official Safety References / Referencias Oficiales

This internal course does not replace task-specific OSHA/EPA training, licensing, competent-person duties, respiratory-protection requirements, or other required qualifications.

Este curso interno no reemplaza entrenamiento específico requerido por OSHA/EPA, licencias, funciones de persona competente, protección respiratoria u otras calificaciones requeridas.

Written Quiz / Examen Escrito

Passing score / Puntuación mínima: 14 of 15.

1. What should happen before interior demolition begins?

¿Qué debe pasar antes de demolición interior?

2. Why are before-work photos important?

¿Por qué son importantes fotos antes del trabajo?

3. Unknown pipe found behind wall. What do you do?

Tubería desconocida detrás de pared. ¿Qué haces?

4. Does Level 6 make a worker an EPA Certified Renovator?

¿Nivel 6 convierte a un trabajador en EPA Certified Renovator?

5. What should be verified before closing a wall?

¿Qué debe verificarse antes de cerrar una pared?

6. A wall may be structural but is shown for removal. What should happen?

Una pared puede ser estructural pero está marcada para remover. ¿Qué debe pasar?

7. Why inspect waterproofing before tile?

¿Por qué revisar impermeabilización antes de tile?

8. Cabinet does not fit. What do you do?

Gabinete no cabe. ¿Qué haces?

9. When should finished flooring be protected?

¿Cuándo debe protegerse el piso terminado?

10. Before calling a fixture complete, what should happen when applicable?

Antes de decir que un fixture está terminado, ¿qué debe pasar?

11. Customer asks to add a shelf. What should happen?

Cliente pide agregar una repisa. ¿Qué debe pasar?

12. What should happen when cutting material can create silica exposure?

¿Qué debe pasar cuando cortar material puede crear exposición a sílice?

13. Who should create the first punch list?

¿Quién debe crear el primer punch list?

14. When should final photos be taken?

¿Cuándo deben tomarse fotos finales?

15. What is the Pazmino renovation rule?

¿Cuál es la regla Pazmino de renovación?